Independent dealer listing

2023 TOYOTA YARIS

Wolverhampton hybrid automatic 15,369 miles
Direct dealer source Original advert linked Completely Independent

Description

Seller summary and highlights for this vehicle.
Compare Save 2023 (23) Toyota Yaris 1.5 Hybrid Design 5dr CVT DY23LYH Petrol Hybrid Automatic 15,369 Miles 68.9 mpg GWM Holdcroft Crewe £16,499 £15,999 10.9% APR £275 /Month PCP Go to TOYOTA YARIS 1.5 Hybrid Design 5dr CVT

Dealer info

Contact details and listing source for this vehicle.

holdcroft.com

Wolverhampton
This vehicle is advertised by the dealer. Always confirm the price, availability and vehicle details before travelling.

PistonTraders aggregates listings from dealer sources. Use “View Full Listing” to open the original dealer page and see all available photos, finance options and live stock status.

Vehicle Details

Specs for Toyota Yaris Hatchback (2020 onwards) 1.5 Hybrid Design 5dr CVT [Nav]
These details are found automatically and may not be accurate, ensure to check with the dealer.

Power
114 bhp
0–62 mph
9.4 sec
Top Speed
109 mph
Torque
120 Nm (89 ft-lb)
Cylinders
3
Engine Size
1490 cc

Body Style
Hatchback (2020 onwards)
Doors
5
Seats
5
Fuel Type
Petrol/Electric Hybrid
Drivetrain
Front wheel drive
Boot Space
286 L
Transmission
Automatic
Gears
1

Co2
92 g/km
ULEZ Compliant
No
Euro Standard
Euro 6
Consumption
57 mpg
Range
456 miles
Fuel Tank
36 L